A/B Validation
Simulate baseline vs a decision (stock reallocation) in the digital twin and measure the uplift on every KPI.
Parameters
Allocation matrix is ;-separated rows of ,-separated numbers (units moved row→column).
Simulate baseline vs a decision (stock reallocation) in the digital twin and measure the uplift on every KPI.
Allocation matrix is ;-separated rows of ,-separated numbers (units moved row→column).